[S156]
TIME
Selasa-Rabu, 25-26 April 2017
VENUE
Hotel Sofyan Inn Tebet, Jalan Prof. Dr. Soepomo, S.H. Kav 23, Tebet Barat-Jakarta Selatan.
INVESTMENT
Rp4.000.000,- /peserta – Registrasi dan pembayaran s.d 30 hari sebelum acara
Rp4.500.000,- /peserta – Registrasi dan pembayaran s.d 7 hari sebelum acara
Rp5.000.000,- /peserta – Normal price, pembayaran dan registrasi saat acara
++ Spesial diskon 10% Minimal 3 peserta dari instansi yang sama
Fasilitas
• Flash disk berisi materi pelatihan
• Sertifikat
• Seminar kit
• Alat tulis: Pulpen dan buku catatan
• Dokumentasi kegiatan
• Training room with Full AC facilities and multimedia
• Lunch and twice coffee break every day of training
• Qualified Instructor
INSTRUCTOR
Ir. Russel Effandy
South East Asia Head: Life and Non Life – Nasco Karaoglan France
DESCRIPTION
WORKSHOP Asuransi untuk Konstruksi Pencakar Langit
Sejak pertengahan abad terakhir sampai ke hari ini, bangunan bertingkat tinggi selalu menjadi landmark dominan dalam sebuah kota yang dapat terlihat dari kejauhan, seperti Menara Antik abad pertengahan. Pada saat yang sama, metode konstruksi pencakar langit ini selalu menjadi cara yang ideal untuk menampilkan kekuasaan dan pengaruh dalam masyarakat. Dengan tujuan ini, pertimbangan ekonomi yang wajar sering dilupakan selama konstruksi bangunan pencakar langit ini berlangsung.
Materi Pelatihan
Day 1
Materi I
Introduction
Materi II
High-rise buildings in the course of history, technology and the environment
• Historical development
• Architectural aspects and urban development today
• Financing models
• Infrastructural aspects
• Economic aspects
• Social and ecological aspects
Materi III
Technology of high-rise construction
• Planning
o Planners
o Regulations and directives
o Technical analyses and special questions
o Construction licensing procedure
o Other constraints
• Execution
o Foundations
o Supporting structure
Load-bearing parts
Special construction methods
Facade
Roof
o Interior finishing
o Service systems
Installations
Deliveries, vehicles
Passenger transport, vertical development
Waste disposal
• Occupancy
o Maintenance, administration
o Conversions
o Rehabilitation
• High-rise construction in the future
Materi IV
Risk potential
• Design errors
• Fire
– Examples of losses during the construction phase
– Fire protection on construction sites
– Examples of losses during the occupancy phase
– Fire-protection regulations, loss prevention
o Regulations
o Structural fire protection
o Active loss-prevention measures
o Fire fighting
o Organizational measures
o Atriums
• Windstorm
• Earthquakes
• Foundations, settlement and subsidence
– Foundations
– Settlement and subsidence
• Water
• Special structural measures
– Conversions
– Rehabilitation
– Demolition
– Disposal
• Other risks
– Terrorism
– Impact
– Collapse
– Wear
• Loss of profit
Materi V
Insurance
• Property insurance
– Contractors’ and erection all risks insurance
– Advance loss of profit insurance
– Insurance of contractors’ plant and machinery
– Decennial liability insurance
– Insurance of buildings, fire insurance
– Loss of profit insurance
o Loss of rent
o Additional costs
o Contingency planning
o Prevention of access
• Third-party liability insurance
– Insurance of the designer’s risk
– Insurance of the construction risk
– Insurance of the operational risk
• Problem of maximum loss
– Construction phase
– Decennial liability insurance
– Operating phase
– Accumulation control
• Underwriting considerations
– Contractors’ and erection all risks insurance
– Contractors’ plant and machinery
– Decennial liability insurance
– Insurance of buildings, fire insurance
• Reinsurance
Summary and outlook
Materi akan disampaikan dalam bahasa Indonesia
INFORMASI PENDAFTARAN
ISIKAN FORM BERIKUT :
atau
Ketik SMS dengan format :
DAFTAR<spasi>
JUDULTRAINING#TGLTRAINING#NAMA#PERUSAHAAN#JMLHPESERTA#EMAIL#TELP.KANTOR
-kirim ke 085286451074
Contoh :
DAFTAR TRAINING FINON#2Mei2011#ARIEF#Company#3#nama@email.com#02174709591
DAFTAR VIA WHATSAPP KLIK DISINI
Print This Post
Email This Post
#emli