Total Productive Maintenance (TPM)

[S080-150-1103]

WAKTU

Jakarta, April 18 – 19, 2011

TEMPAT

Hotel Harris Tebet (tentative)
Jl. Dr Sahardjo No. 191
Tebet – South Jakarta

INVESTASI
Rp 3.500.000,- (Three Million And Five Hundred Thousand Rupiah).

INSTRUKTUR

Professional Trainers and Instructors

DESKRIPSI

Objectives
TPM is a process to maximize the productivity of your equipment for its entire life and will extend the life of the equipment. TPM fosters an environment where improvement efforts in Safety, Quality, Delivery, Cost and Creativity are encouraged, through the participation of all employees. The goal of TPM is to maximize your Overall Equipment Effectiveness (OEE) and to reduce equipment downtime while improving quality and capacity.

This workshop is designed to show that Total Productive Maintenance goes far beyond traditional maintenance boundaries to attack equipment-related waste, including: downtime, speed losses, defects, frequent adjustments, changeover, and breakdowns. Participants are provided with the twelve steps in preparatory and implementation stage of TPM.

Other Benefits
By attending this workshop, participants also obtain the following benefits:
– Understand TPM and its major components, including how to measure and increase overall equipment effectiveness and how TPM can help avoid interruptions to production
– Explain how the TPM process is integrated with other Lean tools to increase productivity
– Gather and analyze Overall Equipment Effectiveness data to determine equipment constraints
– Identify the six major equipment-related losses and how to minimize them in order to increase OEE
– Learn how implementation of the TPM process fosters improvement efforts in safety, quality, delivery, cost, and creativity by all employees

Who Should Attend
Personnel/supervisor/manager from production, maintenance, engineering and quality department.

Agenda
1. Introduction / Background
– Workshop objectives
– Manager roles and functions

2. What is Total Productive Maintenance (TPM)

3. The Benefits of TPM (Tangible and Intangible Benefits)

4. The Twelve Six Steps in TPM Preparation

5. The Six Step TPM Implementation Stage

6. The Seven Levels of Autonomous Maintenance

7. Measuring Overall Equipment Effectiveness
– Availability
– Performance Efficiency
– Quality Rate
– OEE Calculation for a Single Machine
– Calculating a Line or Process OEE Number
– Accounting for Quality Losses
– Plant OEE Calculation
– Corporate or Division OEE Measures
– Showing the Results of OEE
– The Power of OEE

8. Closing (Summary and Conclusion)

INFORMASI PENDAFTARAN
– Silahkan isi form dibawah ini jika anda ingin mendaftar :


atau ketik SMS dengan format :

DAFTAR<spasi>JUDULTRAINING<spasi>TGLTRAINING<spasi>NAMA<spasi>PERUSAHAAN<spasi>JMLH
PESERTA
<spasi>EMAIL

kirim ke 083872671518

Contoh :

DAFTAR COALMINING 27April2011 ARIEF IS21 3 ariefbills@gmail.com

Print This Post Print This Post Email This Post Email This Post


Cara cepat dan mudah Registrasi online di Informasi seminar 21. Mencari jadwal seminar dan training atau request in-house training online.
INFOSEMINAR21 | INFOTRAINING21

Share

Comments are closed.

Post Navigation

Share