Skip to content

Categories:
Dibaca 549 kali

RISK-BASED INSPECTION (RBI) – BANDUNG

[S093]

WAKTU

6-8 Februari 2012 – PASTI JALAN
30 April – 02 Mei 2012
17-19 Oktober 2012
10-12 Desember 2012

TEMPAT

Hotel Golden Flower Bandung

INVESTASI

Rp 6.500.000

INSTRUKTUR

Dr.Ahmad Taufik,M.Eng. is Risk and Integrity Specialist, and Chairman for Indonesian Society for Reliability (ISR). He got his doctorate program from Georgia Institute of Technology, Atlanta, USA (1996). He is now also a lecturer at Graduate Study Program at Bandung Institute of Technology (ITB) teaching for risk and integrity assessment related courses. He has been interacting with oil and gas companies for more than 10 years for training, consultant and project implementation. This much experiences in oil and gas industries will be shared by him in training class. Dr. Ahmad Taufik has much work experiences joining in some institution such as at Lloyd’s Register as Operation Manager, at PT. MMS, PT. Surveyor Indonesia and PT. AT Solusi as consultant and trainer. And at present Dr. Ahmad Taufik is an Asset Integrity Specialist for PT Pertamina PHE-ONWJ (formerly BP West Java, Indonesia). He has performed in depth study in integrity research for pipeline, mechanical and pressurized system. He is member of ASM and ASME. He has wide interest including RBI, PIM, FTA, FMECA, RCA, RAM study and many other risk engineering areas. Dr. Ahmad Taufik has been chairman and speakers for many Oil and Gas International Conferences in Indonesia, (INDOPIPE, MAPREC), Malaysia (ASCOPE), Singapore and China (IPTEC) for the last five years. He has taught many training class on his expertise topics for many companies in Indonesia.

DESKRIPSI

Risk-Based Inspection is a systematical process that identifies, assesses and map industrial risks, which can compromise equipment integrity in both pressurized equipment and structural elements. The high risk equipments are then managed by a proper inspection interval, method and coverage. In the RBI philosophy, it is more cost- effective to allow some systems to fail as long as the consequences of the failure are low, on the other hand, some systems may have such high consequences of failure that failure is totally unacceptable, and therefore, these items should receive most attention by using a proper inspection plan & practice. In this course API 581 and API 580 and other DNV and ABS guidelines and recommended practices, will be consulted.

TRAINING MATERIAL OUTLINE :
1. Defining boundary system to be assessed
2. Screening operating unit within a plant to identify area of high risk.
3. Identifying the damage mechanism operative
4. Determining the technical module sub-factor and likelihood of failures
5. Determining the hazard areas and consequence of failure
6. Estimating a risk value of each equipment, tabulated and ranked
7. Prioritizing the equipment maintenance based on a the measured risk
8. Designing an appropriate inspection program.
9. Systematically managing the risk equipment failures.

TRAINING BENEFIT :
- Increased knowledge of equipment which may pose a potential risk.
- More reliable equipment and plant operation.
- Increased safety.
- Cost optimization through switching to non-invasive inspection techniques.
- Possibility to tailor shutdown scope.
- Option to extend run lengths where applicable national regulations permit it.
- Increased teamwork during the implementation process.
- Development of a knowledge database including equipment design, process features, damage mechanisms and inspection strategies

WHO SHOULD ATTEND THIS TRAINING?
Plant and Pipeline Operators, Supervisors, Engineers and Manager or every one who should know this topic.

INFORMASI PENDAFTARAN
- Silahkan isi form dibawah ini jika anda ingin mendaftar :

Pre-Registration (Pendaftaran Tidak Mengikat)
  1. (required / wajib diisi)
  2. (required / wajib diisi)
  3. Jenis Kelamin
  4. (valid email required / email yang valid dibutuhkan)
  5. (required / wajib diisi)
  6. (required / wajib diisi)
  7. (required / wajib diisi)
  8. (required / wajib diisi)
 

cforms contact form by delicious:days

Print This Post Print This Post Email This Post Email This Post

If you enjoyed this post, please consider leaving a comment or subscribing to the RSS feed to have future articles delivered to your feed reader.
Share

Posted in Februari 2012, Industry, Running Seminars.

Tagged with , , , .

Dibaca 549 kali


Switch to mobile version
sitesecuritymonitor.com seal
Protected by WP-Secure Plugin
SiteSecurityMonitor.com