LV SWITCHGEAR MAINTENANCE AND COORDINATION – BANDUNG

[S093]

24 – 27 Oct 2016
14 – 17 Nov 2016
19 – 22 Dec 2016

TEMPAT

Kagum Group Hotel, Bandung.
available for request at Jakarta, Yogyakarta, Surabaya, Bali

INHOUSE Request? call us

INVESTASI

Rp. 8.500.000/person (full fare)
Rp. 7.950.000/person (early bird, payment 1 week before training)
Rp. 7.500.000/person (if there are 3 persons or more from the same company)

FACILITY :
 Training Hand Out
 Digital Material
 Certificate
 Exclusive Souvenir
 Qualified Bag
 Training Photo
 Training room with full AC facilities and multimedia
 Once lunch and twice coffee break every day of training
 Qualified Instructor
 Transportation from airport / railway to hotel and from hotel to the training venue (3 person from one company)

FASILITATOR

Hasan Surya.Ir.Drs.MT and Team

DESKRIPSI

LV SWITCHGEAR MAINTENANCE AND COORDINATION – Bandung

MATERIAL CONTENTS :
1. Introduction
a. Voltage Convention,
b. Low and Medium Voltage Switchgear,
c. Arc Interruption
2. LV Switchgear
a. System Overview,
b. Switchgear Components,
c. Instrument Transformer Safety,
d. Coordination
3. Circuit breaker ratings & protective relays
a. Types of protective relays,
b. Functions of protective relays,
c. Protection against the failure of circuit breaker operation,
d. Surge protection,
e. Breaking & making capacities of circuit breakers,
f. Short circuit calculations
4. Switchgear Maintenance
a. Operation of switchgear Devices,
b. preventive maintenance,
c. Testing,
d. Corective maintenance
5. Circuit Breaker Overview
a. Purpose/ Application,
b. Circuit Breaker Construction,
c. Circuit Breaker Operation,
d. Circuit Breaker Control
6. Circuit Breaker Construction:
a. Components,
b. Operating Mechanism
7. Types of Circuit Breaker
a. Air Circuit Breakers,
b. Oil Circuit Breaker,
c. Vacuum
8. Insulation Resistance Testing:
a. Factors Affecting Insulation Resistance,
b. Temperature Correction,
c. Insulation Resistance Testing,
d. Circuit Breaker Insulation Resistance Testing,
e. High Potential Testing
9. Power Factor Testing:
a. Advantages,
b. Test Procedure,
c. Data Interpretation
10. Instrument Transformer Testing:
a. Polarity Testing,
b. Turns Ratio Testing,
c. Secondary Excitation Testing
11. Circuit Breaker Maintenance and Testing:
a. Maintenance Fundamentals,
b. Initial Tests,
c. Routine Tests,
d. Adjustments,
e. Insulation Resistance Testing,
f. Contact Resistance Tests,
g. High Potential Tests,
h. Power Factor Tests, and
i. Breaker Motion Analysis

INFORMASI PENDAFTARAN
ISIKAN FORM BERIKUT :

Pre-Registration (Pendaftaran Tidak Mengikat)
  1. (required / wajib diisi)
  2. (required / wajib diisi)
  3. Jenis Kelamin
  4. (valid email required / email yang valid dibutuhkan)
  5. (valid email required / email yang valid dibutuhkan)
  6. (required / wajib diisi)
  7. (required / wajib diisi)
  8. (required / wajib diisi)
  9. (required / wajib diisi)
 

atau

Ketik SMS dengan format :
DAFTAR<spasi>
JUDULTRAINING#TGLTRAINING#NAMA#PERUSAHAAN#JMLHPESERTA#EMAIL#TELP.KANTOR
-kirim ke 085286451074

Contoh :
DAFTAR TRAINING FINON#2Mei2011#ARIEF#Company#3#nama@email.com#02174709591

Print This Post Print This Post Email This Post Email This Post

Share

Comments are closed.

Post Navigation

Share