GROUNDING SYSTEM AND LIGHTNING PROTECTION – BANDUNG

[S093]

24 – 27 Oct 2016
14 – 17 Nov 2016
19 – 22 Dec 2016

TEMPAT

Kagum Group Hotel, Bandung.
available for request at Jakarta, Yogyakarta, Surabaya, Bali

INHOUSE Request? call us

INVESTASI

Rp. 8.500.000/person (full fare)
Rp. 7.950.000/person (early bird, payment 1 week before training)
Rp. 7.500.000/person (if there are 3 persons or more from the same company)

FACILITY :
 Training Hand Out
 Digital Material
 Certificate
 Exclusive Souvenir
 Qualified Bag
 Training Photo
 Training room with full AC facilities and multimedia
 Once lunch and twice coffee break every day of training
 Qualified Instructor
 Transportation from airport / railway to hotel and from hotel to the training venue (3 person from one company)

FASILITATOR

Hasan Surya.Ir.Drs.MT and Team

DESKRIPSI

GROUNDING SYSTEM AND LIGHTNING PROTECTION – Bandung

MATERIAL CONTENTS :
1. Basic Concepts
a. Purpose of Grounding,
b. Basic Safety Concepts,
c. Terms and Definition
2. Safety Standards
a. Permissible Body Currents,
b. Permissible Touch and Step Voltages,
c. Design Considerations
3. Grounding Practices
a. Standards (National/IEEE/IEC),
b. Grounded vs. Ungrounded,
c. Distribution Grounding Electrodes
4. Ground Potential Rise Calculations
a. Fault Current Distribution,
b. Modeling/Analysis Requirements,
c. Thevenin Equivalent at Neutral, Transmission and Distribution System Interaction, High Impedance Faults
5. Soil Modeling
a. Soil Structure ,
b. Soil Measurement Techniques,
c. Soil Resistivity Models,
d. Measurement Interpretation
6. Ground Measurements
a. Fall of Potential Method,
b. The Smart Ground Multimeter,
c. Ground Integrity Tests,
d. Transferred and Induced Voltage Measurements
7. Distribution System Transients
a. Fault Transients,
b. Lightning,
c. Switching,
d. Ferroresonance,
e. Impact of Grounds – Voltage Sags/Swells,
f. Impact on Power Quality
8. Lightning Protection
a. Lightning Overvoltages,
b. Mechanisms of Lightning,
c. Lightning Characteristics,
d. Over Voltage Protection,
e. Insulation Coordination,
f. Protection of RTUs
9. Fault Detection and Isolation
a. Low Impedance Faults,
b. High Impedance Faults,
c. Faulted Circuit Indicators,
d. Fault Distance Indicators

INFORMASI PENDAFTARAN
ISIKAN FORM BERIKUT :

Pre-Registration (Pendaftaran Tidak Mengikat)
  1. (required / wajib diisi)
  2. (required / wajib diisi)
  3. Jenis Kelamin
  4. (valid email required / email yang valid dibutuhkan)
  5. (valid email required / email yang valid dibutuhkan)
  6. (required / wajib diisi)
  7. (required / wajib diisi)
  8. (required / wajib diisi)
  9. (required / wajib diisi)
 

atau

Ketik SMS dengan format :
DAFTAR<spasi>
JUDULTRAINING#TGLTRAINING#NAMA#PERUSAHAAN#JMLHPESERTA#EMAIL#TELP.KANTOR
-kirim ke 085286451074

Contoh :
DAFTAR TRAINING FINON#2Mei2011#ARIEF#Company#3#nama@email.com#02174709591

Print This Post Print This Post Email This Post Email This Post

Share

Comments are closed.

Post Navigation

Share